About the company

Installation, maintenance and cleaning of industrial extraction and filtration systems since 2000

GAKO Air Solutions designs and installs industrial extraction and filtration systems, carries out preventive maintenance on them and cleans extraction and exhaust ductwork. Every part of the system, from the fan through the ductwork to the filtration unit, is handled under a single point of responsibility.

  • Operating since 2000
  • Branches in the north and centre of Israel
  • Fume-hood inspection certifications
Factory building exterior

Company profile

Background and scope

The company was founded in 2000 and initially worked on ventilation systems for commercial kitchens. It later expanded into the industrial sector, including the design, installation and maintenance of extraction and filtration systems in production halls.

  • Industries served: wood, rubber, steel, food, paper and cardboard
  • Complete systems: fan, duct routing and filtration unit
  • Extraction arms and downdraft tables for grinding, cutting and welding stations
Bright factory hall with ventilation ducts under the ceiling

Services

The company provides four complementary services for extraction and filtration systems, so the same team remains responsible for the system throughout its service life.

Design and installation

Design and installation of extraction and filtration systems to suit the production process and the location of emission points, as well as rerouting ducts and extending extraction lines when machines are added or moved.

Preventive maintenance

Periodic inspections under a maintenance contract, including systems installed by other contractors.

Duct cleaning

Opening and internal cleaning of extraction and exhaust ducts with dedicated equipment, with the condition of the duct documented before and after cleaning.

Filter replacement and records

Replacement of filters in filtration units, issue of a replacement certificate and full documentation of all work carried out.

How the work is carried out

  1. 1

    Site survey

    Within 3 working days of the enquiry.

  2. 2

    Quotation

    Within 24 hours of the survey, including scope of work and schedule.

  3. 3

    Execution

    On the agreed date, coordinated in advance with the plant's maintenance manager and safety officer.

  4. 4

    Defect reporting

    Defects identified during the work are reported to the client, even when they fall outside the scope of the order.

Documentation and warranty

ItemDetails
Fire department approval (Form 16)Issued after the ventilation system is cleaned, for the fire authority and the insurer
Annual maintenance contractSigned contract for presentation to the Ministry of Environmental Protection
Filter replacement certificateIssued with every replacement
New fan or motorOne-year warranty
Replaced fanThree-month warranty
System under maintenance contractThe company is responsible for correct extraction performance for as long as the contract is in force and the system is maintained as required

Certification

Professional certification

The company's team holds the certifications required for inspecting fume hoods and extraction systems. Certificates and approvals are available on request.

Spiral ducts in an industrial hall ceiling

Company branches

North branch

74 Haroshet St., Kiryat Bialik

WazeMap

Central branch

1 HaMakhtesh St., Holon

WazeMap

Book a site survey

On-site survey within 3 business days of your request, and a quote within 24 hours of the survey.

On-site survey within 3 business days

Leave your details and we'll call to schedule. You'll have a quote within 24 hours of the survey.