Maintenance

Maintenance contracts for extraction and ventilation systems

GAKO maintains extraction and filtration systems in industrial plants, including systems installed many years ago and systems installed by others. Every visit is scheduled in advance and carried out on the agreed date, and the work is done thoroughly until the system is extracting properly again.

Large ventilation ducts in a plant room

Service principles

Maintenance that starts with scheduling and continues for years

GAKO's maintenance contract rests on the working principles that guide us in every plant, and we follow them on every visit.

  • Every visit scheduled in advance with the maintenance and operations manager
  • Arrival on the agreed date
  • A report on any defect found during the work, including defects outside the scope of the order
  • Complete and thorough work, including on systems that have run for many years
  • Support for the system for years after installation
Worker in a hard hat and vest in a bright warehouse

What the contract includes

Maintenance contract components

  • Scheduled inspections at a frequency set in the survey, by system type and load
  • Differential pressure measurement across the filters, with replacement as needed
  • Cleaning of ducts, hoods and filter housings
  • Fan checks: motor, belts, bearings, vibration and noise
  • Repair of faults found during inspection
  • A written record of every visit, and a filter replacement certificate after every change
  • An annual maintenance agreement that can be presented to the environmental authorities, for plants that require one
Dust collector with bag filters and pulse-jet cleaning system

What an inspection covers

ComponentWhat we checkWhat we do
Filters and bagsDifferential pressure, damage and leaksReplacement per the manufacturer's instructions
DuctsDust or grease build-up, leaks and jointsCleaning and repair
Fan and motorVibration, noise, belt tension and bearing conditionAdjustment, lubrication and component replacement
Extraction pointsActual capture at the workstationsDamper balancing and repair
ControlsOperation of sensors, relays and alarmsCalibration and repair

The frequency and scope of inspections are set in the first survey and written into the contract.

Warranty

Warranty under the maintenance contract

For as long as the system is under a maintenance contract with us, we are responsible for it extracting as it should. One-year warranty on new fans and motors, and three months on a replaced fan.

Industrial fan with motor in a stainless steel plant

Getting started

  1. 1

    Survey

    Within 3 business days of your request. We map the system and its condition.

  2. 2

    Quote

    Within 24 hours of the survey, with the proposed inspection frequency and price, and initial servicing where needed.

  3. 3

    Initial servicing

    Bringing the system back to its design figures before the regular inspections begin.

  4. 4

    Inspections

    Inspections according to the plan, with a written record after every visit.

Book a site survey

On-site survey within 3 business days of your request, and a quote within 24 hours of the survey.

On-site survey within 3 business days

Leave your details and we'll call to schedule. You'll have a quote within 24 hours of the survey.